- Start
- Design and Cost Estimate of a 25, 000 K. V. A. Generating System
Design and Cost Estimate of a 25, 000 K. V. A. Generating System
Angebote / Angebote:
Excerpt from Design and Cost Estimate of a 25, 000 K. V. A. Generating System: A ThesisAll concrete work is of l-2%b5 mix. Foundations for main walls, main units to chimneys are six feet in depth (to bed-rock). The main walls are 20 in thick ness and of a total volume of 420 cu. Yds. The chimney foundations are of an average diam. Of 16' and of a total volume of 90 cu. Yds. The foundations for the turbo-generators are as shown in the plan and of a total volume of 155 cu. Yds., for the two rotary converters in the included substation, a total volume of 20 cu. Yds. The floors of boiler room, and basement, tur bine-room, and switch house are of a total volume of.About the PublisherForgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.comThis book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully, any imperfections that remain are intentionally left to preserve the state of such historical works.
Folgt in ca. 10 Arbeitstagen