- Start
- Engineering and Contracting, Vol. 28
Engineering and Contracting, Vol. 28
Angebote / Angebote:
Excerpt from Engineering and Contracting, Vol. 28: A Weekly Journal for Civil Engineers and Contractors, July-December, 1907The bridge was designed for a live load of engine and tender weighing 112 tons, followed by a train of lbs. Per lin. Ft. The dead load was lbs. Per lin. Ft.The cost of the bridge to the railway company was as follows.About the PublisherForgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.comThis book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully, any imperfections that remain are intentionally left to preserve the state of such historical works.
Folgt in ca. 5 Arbeitstagen