info@buecher-doppler.ch
056 222 53 47
Warenkorb
Ihr Warenkorb ist leer.
Gesamt
0,00 CHF
  • Start
  • The Comparison of Gas Engines and Steam Turbines as Prime Movers, and the Design of a Six Hundred Kilowatt Steam Turbine Plant (Classic Reprint)

The Comparison of Gas Engines and Steam Turbines as Prime Movers, and the Design of a Six Hundred Kilowatt Steam Turbine Plant (Classic Reprint)

Angebote / Angebote:

Excerpt from The Comparison of Gas Engines and Steam Turbines as Prime Movers, and the Design of a Six Hundred Kilowatt Steam Turbine PlantIt was found from the Physics Department and the Engineer's office that the Physics building will have a possible power intake of eighty kilowatts, and the Administration building, thirty kilowatts. The building is carried at present, but only at times when the power plant is not heavily loaded.Therefore, the load required by this building at times of peak load should be added to the present peak in estimating the future load. Although under ordinary conditions the maximum demand of the building does not occur at times of peak loads, it is possible on cloudy days for this building to require in the neighborhood of fifteen kilowatts in the morning and afternoon when the plant is most heavily loaded.About the PublisherForgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.comThis book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully, any imperfections that remain are intentionally left to preserve the state of such historical works.
Folgt in ca. 10 Arbeitstagen

Preis

41,50 CHF

Artikel, die Sie kürzlich angesehen haben